IPS energy systems are designed to deliver strong and predictable financial performance by reducing conventional energy costs and improving long-term operational efficiency.
By combining advanced energy technologies with optimized system integration, our projects convert ongoing energy expenditures into stable, long-term infrastructure assets with measurable economic value.
Typical project IRR ranges between 20–35%, driven by energy cost savings and stable operating expenses.
Most systems achieve 3–5 year payback, depending on energy profile, operating hours, and system configuration.
Energy systems can reduce conventional energy expenditure by up to 50–90% depending on fuel and load profile.
Diesel: ~ 0.08 JOD/L
LPG: ~ 0.06 JOD/L
Heavy Oil: ~ 75 JOD/ton
Projects can be delivered under guaranteed savings contracts, supported by continuous performance monitoring and measurement & verification (M&V).
IPS systems are designed for ~25 years of operation with low degradation and minimal maintenance.